Power and Energy

Capacity of Power Installed, 2011-12 to 2021-22:

Year

Unit

Diesel

Hydro

Thermal

Solar

Total

2011-2012

MW

0.50

29.35

22.92

0

52.77

2012-2013

MW

0.50

29.05

22.92

0

52.47

2013-2014

MW

0.50

29.35

22.92

0

52.77

2014-2015

MW

0.50

29.35

22.92

0

52.77

2015-2016

MW

0

29.35

22.92

0

52.27

2016-2017

MW

0

29.35

0

0

29.35

2017-2018

MW

0

29.35

0

0

29.35

2018-2019

MW

0

29.35

0

0.30

29.70

2019-2020

MW

0

29.35

0

0.35

29.70

2020-2021

MW

0.50

29.35

22.92

1.04

53.81

2021-2022

MW

0

29.35

02.3531.7

Source: Statistical Abstract of Mizoram 2021

           Statistical Handbook Mizoram 2022

 

Net Generation of Electricity with Imports, 2001-02 to 2020-21:

Year

Unit

Diesel

Hydro

Thermal

Solar

Import

Total

2001-2002

MU

3.2

5.94

-

-

241.57

250.71

2002-2003

MU

2.98

6.73

-

-

258.75

268.46

2003-2004

MU

0.7209.6--281.25291.57

2004-2005

MU

0.0645.750.59-380.03386.43

2005-2006

MU

0.3738.502.40-391.53402.8
2006-2007MU0.08710.872.01-240.84253.81

2007-2008

MU

0.03015.922.57-347.82366.34

2008-2009

MU

0.016*7.332.49-285.22295.04
2009-2010MU0.02013.343.97-308.18325.51

2010-2011

MU

0.011**37.521.699

0

390.24429.47
2011-2012MU0.02018.33-

0

369.58387.93
2012-2013MU0.01958.59-

0

340.10398.71
2013-2014MU0.01855.321-

0

424.971480.31
2014-2015MU0.01935.157-

0

502.50537.673
2015-2016MU028.88-

0

565.55594.43
2016-2017MU052.22-

0

645.73697.95
2017-2018MU057.11-

0.17

611.29668.4

2019-2020

MU

0

50.68

0

0.35

430.76

481.44

2020-2021

MU

0.01

29.57

0

1.77

413.57

444.92

(-) Nil

** Out of 37.52 MU generation, 15.30 MU generated by Serlui B SHP was included, although this SHP is not yet commissioned.

Source: Statistical Abstract of Mizoram 2011, 2013, 2015 and 2021

Source: Statistical Handbook Mizoram, 2018

 

Consumption of Electricity by Users and Per Capita Consumption, 2011-12 to 2021-22:

Year

Unit

KJP

Domestic

Commercial

Public Lighting

Public Water Works

Agriculture
2011-2012

MU

3.39

170.91

18.88

6.04

36.28

3.71

2012-2013

MU

3.89

193.69

21.10

5.36

37.23

0.08

2013-2014

MU

3.69

200.15

23.57

7.47

40.22

0.06

2014-2015

MU

3.29

214.50

34.02

7.20

46.68

0.038

2015-2016

MU

4.17

218.10

37.48

6.50

49.03

0.05

2016-2017

MU

4.41

233.90

33.87

4.89

49.95

0.27

2017-2018

MU

3.56

235.14

47.34

2.24

41.59

0.14

2018-2019

MU

3.41

225.70

59.22

13.32

57.85

0.27

2019-2020

MU

5.60

208.96

36.40

0.43

50.60

0.11

2020-2021

MU

7.19

276.24

44.26

2.11

82.45

0.16

2021-2022MU5.63280.24

47.89

2.3580.550.14

Source: Statistical Abstract of Mizoram 2021

Source: Statistical Handbook Mizoram, 2022

 

Power Status in Mizoram, 2020-21 and 2021-22:

Sl. No.

Particulars

2020-21

2021-22

1

Estimated Power Potential (MW)

0.00

3,663.00

2

Allocated Share of Power (MW)

0.00

262.52

3

Real Time Power Availability (MW)

90.00

122.89

4

Peak Power Demand (MW)

132.23

155.58

5

Transmission & Distribution Losses (%)

29.05

28.31

6

Aggregate Technical & Commercial Losses  (AT & C Losses)-%

39.55

37.22

7

Power Import Expenditure (Rs. in lakhs)

36,170.00

40,969.97

Source: Statistical Handbook Mizoram 2022

 

Number of Village Electrified, 2011-12 to 2021-22:

Year

No of Inhabited Villages

No of Villages Electrified

Percentage of Electrified Villages (%)

2011-2012

704

661

93.90

2012-2013

704

664

94.30

2013-2014

704

670

95.17

2014-2015

704

675

95.90

2015-2016

704

675

95.90

2016-2017

699

688

98.43

2017-2018

699

699

100.00

2018-2019

699

699

100.00

2019-2020

699

699

100.00

2020-2021

725

692

95.45

2021-2022

725

692

95.45

Source: Statistical Abstract of Mizoram 2021

Source: Statistical Handbook Mizoram 2022

 

District wise Number of Villages Electrified, 2021-22:

(Upto 27th Jan, 2022)

District

No of Inhabited Villages

No of Villages Electrified

Percentage of Electrified Villages (%)

Mamit

93

84

90

Kolasib

36

36

100

Aizawl

60

60

100

Champhai

43

43

100

Serchhip

34

34

100

Lunglei

132

120

91

Lawngtlai

169

157

93

Siaha

70

70

100

Saitual

36

36

100

Khawzawl

26

26

100

Hnahthial

26

26

100

Mizoram

725

692

95.45

Source: Statistical Handbook Mizoram 2022

 

Transmission & Distribution Losses, 2001-02 to 2021-22:

Sl. No.Year

Losses in %

1

2001-2002

47

2

2002-2003

45

3

2003-2004

44

4

2004-2005

39

5

2005-2006

36

6

2006-2007

41

7

2007-2008

37

8

2008-2009

31

9

2009-2010

41

10

2010-2011

34.75

112011-201234.83
122012-201330.22
132013-201433.02
142014-201529.81
152016-201725.53
162017-201821.70
17

2018-2019

22.75

18

2019-2020

15.82

19

2020-2021

29.05

202021-202228.31

Source: Statistical Abstract of Mizoram 2011, 2013, 2015 and 2021

Source: Statistical Handbook Mizoram, 2022

 

Month-wise Revenue Collection in Mizoram, 2015-16 and 2016-17:

Month2015-20162016-2017
Sale of Energy (Rs. in Lakh)Misc. (Rs. in Lakh)Power Purchased (MU)Sold through IEX (MU)Sale of Energy (Rs. in Lakh)Misc. (Rs. in Lakh)Power Purchased (MU)Sold through IEX (MU)
April761.6417.3735.892.70859.1816.7744.108.55
May835.5117.8040.183.27996.52296.9851.0417.25
June687.8614.5750.7111.021356.5417.8060.0025.23
July1315.6420.1858.1219.351499.6916.7772.9436.78
August1007.1718.2656.0616.211582.9419.3463.1026.35
September1327.2218.1944.0910.451397.0517.8758.5021.27
October1031.6919.7848.028.581350.0116.46--
November1037.7618.1248.354.18----
December974.4119.9346.271.74----
January669.7314.4850.682.13----
February2143.4021.8444.302.55----
March4586.8217.4842.881.56----
G. Total16378.85218.00565.5583.749041.93401.99349.68135.43

Source: Economic Survey Mizoram 2016-17

 

Revenue Collected and Expenditure for Import of Power, 2000-01 to 2013-14:

(Rs. in Lakhs)

Year

Revenue Collected

Expenditure for Import

2000-20012032.705614.00
2001-20022282.493600.00
2002-20032009.344664.00
2003-20042588.215572.00
2004-200554417607.47
2005-200680377424.48
2006-20074305.868000.00
2007-20088121.56*7668.99
2008-200983928888.00
2009-201067627785.00
2010-20115553.0010115.65
2011-201210919.0017992.14#

2012-2013

11188.00

18374.00

2013-2014

11162.74

17624.05

* Rs.790.97 lakhs received from PHE which is due for 2006-07

# As on 28.6.2012

Source: Statistical Handbook, Mizoram 2002, 2004, 2006, 2008, 2010, 2012 and 2014