Power and Energy in Manipur

District-wise Number of Sub-Station in Manipur, 2017-18 to 2019-20:

District

2017-2018

2018-2019

2019-2020

132/33KV

33/11 KV

132/33KV

33/11 KV

132/33KV

33/11 KV

Senapati 

12 

12 

12 

Tamenglong 

Churachandpur 

10 

10 

12 

Chandel 

Ukhrul 

10 

10 

Imphal East 

12 

12 

14 

Imphal West 

12 

12 

13 

Bishnupur 

Thoubal 

10 

Manipur 

15 

84 

17 

85 

17 

92 

Source: Economic Survey Manipur 2020-21

 

Net Energy Available in Manipur, 2015-16 to 2019-20:

YearPower (Lakh KWH)
PurchasedFree Energy from Loktak Hydro Electric ProjectTotal Available

2015-16 

8859.50 

618.10 

9477.60 

2016-17 

9853.50 

858.40 

10711.90 

2017-18 

9591.95 

971.62 

10563.57 

2018-19 

9985.12 

694.67 

10679.79 

2019-20 

9205.15 

419.72 

9624.87 

Source: Economic Survey Manipur 2020-21

 

Project Power Requirement of Manipur according to draft 19th Electric Power Survey Forecast, 2020-21 to 2022-23:

YearPeak Load (MW)Energy Requirement (MU)

2020-21 

372

1925

2021-22 

410

2103

2022-23 

453

2300

Source: Economic Survey Manipur 2020-21

 

Demand and Supply of Power of Manipur, 2014-15 to 2019-20:

Year

Peak Load Met (MW)

Energy Requirement Met (MU)

2014-15 

158 

735 

2015-16 

170 

834 

2016-17 

170 

761 

2017-18 

195 

830 

2018-19 

215 

895 

2019-20 

217.26* 

910 

* As on 17th January, 2020

Source: Economic Survey Manipur 2020-21

 

Share of Power for Manipur from Central Sector, 2019-20:

Sl. No.Name of the ProjectInstalled Capacity (MW)Allocation from (MW)
Firm ShareUnallocated Share
1

Loktak HPS 

105 (90) 

39

6.1

2

Khandong HPS 

50(43) 

3

0.6

3

Kopili +Kopili Ext. HPS 

200(170) 

12

2.4

4

Kopili HEP Stage-II 

25(21) 

1

0.3

5

Kathalguri GPS 

291(247) 

20

3.6

6

Agartala GTP-CC 

130(111) 

9

1.5

7

Bongaigaon Thermal PP 

750(638) 

31

9

8

Doyang HPS 

75(64) 

5

0.9

9

Ranganadi HPS 

405(345) 

29

4.8

10

Pallatana GPP 

726(628) 

42

-

11

Pare HEP 

110 (94) 

8

1.3

Source: Economic Survey Manipur 2020-21

 

Achievement of Deen Dayal Upadhaya Gram Jyoti Yojana:

DistrictScopeAchievement as on 30.03.202
Census VillageHabitationCensus VillageHabitation

Bishnupur 

1

25

1

25

Chandel 

61

17

61

17

Churachandpur 

97

45

97

45

Tamenglong 

13

27

13

27

Senapati 

26

61

26

61

Ukhrul 

14

81

14

81

Total212256212256

Source: Economic Survey Manipur 2020-21

 

District-wise Electric Consumption of Power, 2016-17:

(MU)

DistrictDomesticCommercialIndustrialPublic LightingIrrigation & AgriculturePublic Water WorkBulk SupplyTotal

Senapati 

25.91

2.72

2.3

0.32

0

0.06

8.57

39.88

Tamenglong 

1.79

0.23

0.02

0.01

0

0

1.69

3.74

Churachandpur 

12.15

1.82

0.18

0

0

0

2.12

16.27

Chandel 

7.4

0.96

0.01

0.39

0

0.07

1.1

9.93

Ukhrul 

4.44

0.35

0.01

0.02

0

0

2.1

6.92

Imphal East 

73.55

11.25

12.67

0.53

0.02

9.72

25.13

132.87

Imphal West 

105.03

22.74

3.89

0.82

0.03

8.56

36.23

177.3

Bishnupur 

28.91

2.46

1.27

1.29

0.7

2.05

3.06

39.74

Thoubal 

38.99

1.15

1.34

0.06

0.2

3.05

8.23

53.02

Manipur 

298.17

43.68

21.69

3.44

0.95

23.51

88.21

479.65

Source: Economic Survey Manipur 2020-21

 

Number of Consumers by Categories in Manipur, 2019-20:

Sl. No.CategoryNumber of Consumer
1

Domestic 

473161

2

Commercial 

23787

3

Public Lighting 

462

4

Public Water Supply-LT 

35

5

Irrigation and Agricultural-LT 

47

6

Small Industry-LT 

2367

7

Commercial-HT 

694

8

Public Water Supply-HT 

174

9

Irrigation and Agricultural-HT 

27

10

Medium Industry-HT 

80

11

Large Industry-HT 

38

12

Bulk Supply-HT 

388

Source: Economic Survey Manipur 2020-21

 

Power Scenario of Manipur, 1993-94 to 2016-17:

Year

Installed Capacity (kw)

Electricity Generated (lakh kwh)

Energy Purchased

(lakh kwh)

Electricity Consumed

(mill. kwh)

Inhabited Villages according to Census

Number of Villages Electrified

Percentage of Electrified Villages to Total Villages

1993-1994

12422

32.68

2,763.51

216.510

2,182

1,525

69.89

1994-1995

12622

29.67

2,712.76

213.738

2,182

1,590

72.87

1995-1996

12371

21.66

2,550.26

247.315

2,182

1,748

80.11

1996-1997

12371

10.71

3,037.99

286.377

2,182

1,888

86.56

1997-1998

12622

6.80

3,463.14

322.180

2,182

1,940

88.91

1998-1999

11845

7.57

3,756.68

179.889

2,182

1,990

91.20

1999-2000

11845

8.29

3,926.73

173.066

2,182

2,001

91.70

2000-2001

11845

4.29

3,556.24

176.936

2,182

2,001

91.70

2001-2002

11845

6.67

3,798.26

167.562

2,320

2,001

86.25

2002-2003

47252

35.77

4,271.84

165.645

2,320

2,007

86.51

2003-2004

47052

42.80

4,313.49

165.383

2,320

1,899

81.85

2004-2005

47252

14.325

5,712.60

141.254

2,320

1,903

82.03

2005-2006

47252

3.140

5,209.86

299.815

2,320

1,930

83.19

2006-2007

47252

31.053

4,412.16

221.882

2,320

1,942

83.71

2007-2008

46212

6.02

4,252.31

334.964

2,320

1,966

84.74

2008-2009

44820

6.46

6,159.38

301.602

2,320

1,986

85.60

2009-2010

45420

20.105

4651.21

290.369

2,320

2002

79.32

2010-2011

45020

19.301

5672.18

-

2515

2071

86.29

2011-2012

45020

16.150

5633.70

-

2515

2258

82.35

2012-2013

36600

12.400

5783.44

-

2515

-

89.78

2013-2014

36600

8.440

6064.02

-

2515

-

-

2014-2015

29490

6.525

6525.80

442.27

2515

2134

84.85

2015-2016

22110

-

7654.90.*

474.86

2515

-

-

*: An on 31st January 2016 (MSPDCL)

Source: Economic Survey Manipur 2015-16 and 2016-17

 

Electricity generated and consumed in Manipur, 2009-10 to 2015-16:

(Million KWH)

Sl. No.

Item

Unit

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

1.

Installed Capacity

MW

45.420

45.020

45.020

36.600

36.600

2.949

2.211

2.

Electricity Generated

Million Kwh

2.0105

1.9301

1.615

0.124

0.084

0.6525*

366.600

3.

Energy Purchased

Million Kwh

-

567.218

-

-

-

644.990

885.95*

4.

Electricity Consumed:

 

 

 

 

 

 

 

 

a)

Domestic

Million Kwh

127.485

-

-

-

-

256.65*

298.85*

b)

Commercial light & small power

16.009

-

-

-

-

35.83*

39.84*

c)

Industrial

8.796

-

-

-

-

29.12*

23.81*

d)

Street lighting

4.230

-

-

-

-

4.43*

4.13*

e)

Irrigation & Agriculture

0.750

-

-

-

-

2.41*

1.78*

f)

Public water work & Sewage pumping

18.201

-

-

-

-

16.99*

16.69*

g)

Bulk supply

44.604

-

-

-

-

96.84*

89.75*

h)

Temporary supply

-

-

-

-

-

-

-

5.

Free energy from NHPC

Lakh Kwh

-

709.090

610.490

-

-

42.420

618.100

6.

Villages Electrified

Number

2002

2071

2258

-

-

2134

2220

*: MU (Mega Unit)

Source: Statistical Handbook Manipur 2017

 

Consumption of Electricity by Users in Manipur

(Million KWH)

Sl. No.

Item

2008-09

2009-10

2010-11

2011-12

2014-15

2015-16

1.

Small power, Light & Fans

 

 

 

 

 

 

(a)

Domestic

120.116

127.485

-

-

256.65

298.85

(b)

Commercial

14.219

16.009

-

-

35.83

39.84

2.

Industrial

-

-

-

-

29.12

23.81

(a)

Low Medium Volt

8675

8.796

-

-

-

-

(b)

High Medium Volt

-

-

-

-

-

-

3.

Public Lighting

3.199

4.23

-

-

-

-

4.

Agriculture & Irrigation

0.121

0.75

-

-

4.43

4.13

5.

Public Water work & Sewage Pumping

9.636

18.201

-

-

2.41

1.78

6.

Bulk Supply

40.748

44.604

-

-

16.99

16.69

7.

Temporary

0.491

-

-

-

96.84

89.75

 

Total Consumption

197.205

220.075

271.097

324.760

442.27

474.85

Source: Statistical Handbook Manipur 2017

 

District wise No. of Sub-Station in Manipur during 2012-13 to 2015-16:

Districts

No. of Sub-Station

2012-2013

2013-2014

2014-2015

2015-2016

132/33 KV

33/11 KV

132/33 KV

33/11 KV

132/ 33 KV

33/11 KV

132/ 33 KV

33/11 KV

Senapati

2

8

2

8

5

8

2

10

Tamenglong

1

6

1

6

2

6

1

7

Churachandpur

1

5

1

6

3

6

1

7

Chandel

0

2

0

2

1

2

1

4

Ukhrul

0

6

0

6

1

6

1

7

Imphal East

2

7

2

7

5

10

2

10

Imphal West

1

10

1

10

3

10

2

11

Bishnupur

1

5

1

5

2

5

1

5

Thoubal

1

4

1

4

2

5

1

7

Manipur

9

53

9

54

24

58

12

68

Source: Economic Survey Manipur 2015-16 and 2016-17

 

The erstwhile Electricity Department, Manipur was unbundled and corporatized into the following two State Owned functionally independent successor entities w.e.f. 1st February, 2014, in pursuance of Electricity Act, 2003:

 

(i) Manipur State Power Company Limited (MSPCL)

(ii) Manipur State Power Distribution Company Limited (MSPDCL)

 

The functions of the two entities are depicted in Following table:

Entity

Activities

1. MSPCL

(a) Transmission network of 33 KV and above

(b) All Sub-station of 33/11 KV and above

(c) All generation  units other than those mentioned in MSPDCL

(d) State Level Load Dispatch Centre (SLDC) is currently with MSPCL. An independent society called Manipur State Level Load Dispatch Society is being formed to take up the work of SLDC.

2. MSPDCL

(a) Transmission network of 11 KV and below

(b) All other distribution activities

(c) Generation assets at 36 MW Heavy Fuel at Leimakhong, Hydel Plant at Leimakhong, existing DG Sets

(d) Revenue collection activities

Source: Economic Survey Manipur 2016-17

 

Demand and Supply of Power in Manipur, 2003-04 to 2015-16:

Year

Power (MW)

Demand

Part of the Demand Met

Shortfall

2003-2004

189

106

83

2004-2005

116

108

8

2005-2006

140

115

25

2006-2007

155

110

45

2007-2008

145

110

35

2008-2009

157

100

57

2009-2010

170

110

60

2010-2011

184

110

74

2011-2012

171

115

56

2012-2013

201

119

82

2013-2014

229

130

99

2014-2015

262

232

30

2015-2016

301

167.19

133.81

Source: Economic Survey Manipur 2015-16 and 2016-17

 

District-wise Electricity Consumption of Power, 2014-15 and 2015-16:

Districts

Domestic

Commercial

Industrial

Public Lighting

Irrigation & Agriculture

Public Water Work

Total

2015-2016

Senapati

26.62

4.63

4.57

0.33

0.00

0.13

36.28

Tamenglong

2.08

0.14

0.04

0.03

0.00

0.03

2.32

Churachandpur

44.84

1.51

0.32

0.06

0.00

0.00

46.73

Chandel

8.73

2.22

0

0.39

0.00

0.07

11.41

Ukhrul

4.29

0.38

0.06

0.04

0.00

0.00

4.77

Imphal East

70.69

6.07

12.99

0.48

0.13

9.08

99.44

Imphal West

83.85

21.47

3.46

0.95

0.00

1.96

111.69

Bishnupur

25.65

2.27

0.94

1.79

1.22

2.03

33.90

Thoubal

32.10

1.16

1.44

0.06

0.43

3.40

38.59

Manipur

298.85

39.84

23.81

4.13

1.78

16.70

385.13

2014-2015

Senapati

23.00

3.71

7.16

0.32

0.00

11.99

46.18

Tamenglong

2.13

0.18

0.02

0.02

0.00

0.33

2.68

Churachandpur

34.39

1.21

0.34

0.06

0.00

8.47

44.47

Chandel

3.23

0.99

0.004

0.37

0.00

7.09

11.68

Ukhrul

2.98

0.31

0.05

0.04

0.00

1.86

5.24

Imphal East

63.52

5.74

13.25

0.47

0.13

32.11

115.22

Imphal West

80.00

21.32

6.02

1.40

0.00

37.69

146.43

Bishnupur

20.74

1.44

0.80

1065

1.74

3.43

29.80

Thoubal

26.66

0.93

1.48

0.10

0.54

10.86

40.57

Manipur

256.65

35.83

29.12

4.43

2.41

113.83

442.27

Source: Statistical Yearbook of Manipur 2015

Economic Survey Manipur 2016-17

 

Requirement of Power & Energy in Manipur during 2010-11 to 2015-16:

Year

Peak load (MW)

Energy requirement (MU)

2010-2011

184

838

2011-2012

171

615

2012-2013

201

722

2013-2014

229

824

2014-2015

262

956

2015-2016

301

1080

Source: Economic Survey Manipur 2015-16 and 2016-17

 

Power availability in respect of Manipur, 2007-08 to 2015-16:

Year

Power (Lakh KWH)

Requirement

Generated

Purchased

Free Energy from Loktak Hydro Electric Project

Total Available (Col. 3 to Col. 5)

Short-fall

Per Capita Availability*

2007-2008

6,410

17.30

5720.30

707.70

6,445.30

35.3

246.06

2008-2009

7,020

6.46

5504.25

587.69

6,098.40

921.60

228.41

2009-2010

7,660

20.11

4651.21

447.86

5,119.18

2,540.82

188.15

2010-2011

8,380

20.11

5672.18

709.09

6401.38

1978.62

230.93

2011-2012

6150

15.64

5633.70

610.49

6259.83

109.83

216.77

2012-2013

7220

10.08

5783.44

669.04

6462.56

757.44

218.62

2013-2014

8240

10.10

6064.02

736.86

6810.98

1429.02

225.45

2014-2015

9420

10.10

6425.80

424.20

6860.10

2699.90

222.21

2015-2016

10800

Nil

7654.90*

579.30

8234.20

-

-

*Per Capita Availability is calculated by using Estimated Population

Source: Economic Survey Manipur 2015-16 and 2016-17

 

Share of power for Manipur from Central Sector, 2015-16:

Name of the Project

Installed Capacity MW

Share of Manipur (As on 30 Aug. 2015)

Percent

MW

Loktak Hydro Electric Project (NHPC)

105

36.57

384**

Khangdong HPS

50

5.33

3

Kopilli + Kapilli HPS

200

6.17

12

Kopilli HEP Stage II

25

6.0

2

Kathalguri GPS

251

6.9

23

Agartala GPS

84

7.0

6

Agartala GPS Extra Unit I

23

6.85

1.6

Doyang HPS

75

6.7

5

Ranganadi HPS

405

7.16

29

Pallatana GPP

726

5.79

42

Total

1984

94.47

162.00

**- Inclusive of allocation of surrendered share 8 MW by Meghalaya to Manipur

Source: Economic Survey Manipur 2016-17

 

Power Sector in Manipur 2013: