Skip to main content

Power

Sector-wise Electricity Consumption 2008-09 to 2015-16:

(in Kwh per annum)

Category

2008-2009

2009-2010

2010-2011

2011-2012

2012-2013

2013-2014

2014-2015

2015-2016

Agriculture

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Domestic

56.20

58.40

57.97

82.77

78.98

83.98

78.93

74.96

Commercial

28.90

29.30

29.23

29.72

38.26

35.43

35.33

37.43

Public Lighting

2.60

2.60

2.60

2.30

0.43

0.35

0.29

0.15

Temporary Supply

0.10

0.10

0.15

0.30

0.09

1.61

1.36

1.16

HT Industrial consumers

57.50

59.20

58.39

71.63

91.76

97.11

110.49

126.30

LT Industrial consumers

1.20

1.90

1.31

8.63

1.15

1.15

1.37

1.34

Bulk Supply

13.50

14.50

13.35

13.21

16.23

17.74

20.98

23.37

Outside State

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

160.00

166.00

163.00

208.56

226.90

237.37

248.75

264.71

Source: Energy and Power Department, Govt. of Sikkim

 

Year-wise Energy Consumption, 2010-11 to 2014-15:

YearEnergy Consumption (MU)PopulationPer Capita Consumption (in kWh)
RuralUrbanRuralUrbanRuralUrban

2010-2011

130.54

69.17

480981

59870

271.41

1155.4

2011-2012

136.89

71.37

456999

153578

299.54

464.73

2012-2013

126.68

79.49

456999

153578

277.19

517.61

2013-2014

135.1

78.06

456999

153578

295.62

508.29

2014-2015

119.88

74.12

456999

153578

262.33

482.63

Source: Energy and Power Department, Govt. of Sikkim

 

Energy Generation of Sikkim, 2010-11:

Sl. No.

Name of projects

Installed capacity (MW)

Gross Generation (MU)

Auxiliary Consumption (MU)

Net Generation (MU)

Remarks

1.

LLHP

2×6.00

24.195

0.0573

24.1374

 

2.

JPH

6×0.35

3.163

0.0342

3.1285

 

3.

Rimbi-I

3×0.20

0.165

0.0033

0.1613

 

4.

Rimbi-II

2×0.50

0.415

0.0023

0.4123

 

5.

Rothak

2×0.10

0

0

0

Power house abandoned

6.

Rongnichu

5×0.50

0.854

0.0117

0.8423

 

7.

Chaten

2×0.50

0

0

0

Power House abandoned

8.

Meyongchu

2×2.00

6.589

0.0054

6.5832

 

9.

URHP

4×2.00

0

0

0

No generation due to failure of water conductor system

10.

Kalez

2×1.00

0.76

0.0042

0.7562

 

11.

Lachung

2×0.10

1.025

0.0123

1.0125

 

12.

Rabomchu

2×1.50

3.522

0.0089

3.5131

 

13.

DPH Gangtok

4×1.00

0.153

0

0.153

 

14.

DPH LLHP Ranipool

4×0.248

0.001

0

0.0007

 

Total

41.892

40.84

0.1396

40.7007

 

Source: Sikkim Statistical Profile 2011-12

 

District wise Installed Capacity and Energy Generation, 2008-09 to 2010-11:

District

Name of Power House

Installed Capacity (MW)

Generation (MU)

2008-09

2009-10

2010-11

2008-09

2009-10

2010-11

North

Meyongchu

2×2.00

2×2.00

2×2.00

5.71

5.52

6.589

Rabomchu

2×1.50

2×1.50

2×1.50

5.13

3.01

3.522

Lachung Stage-II

2×0.10

2×0.10

2×0.10

0

0

1.025

Chaten

2×0.50

2×0.50

2×0.50

0

0

0

East

Rongnichu

2×0.50

2×0.50

2×0.50

0.46

2.17

0.854

URHP

4×2.00

4×2.00

4×2.00

0

0

0

JPH

6×0.35

6×0.35

6×0.35

0.74

3.55

3.163

LLHP

2×6.00

2×6.00

2×6.00

35.99

24.277

24.195

DPH, LLHP, Ranipool

4×0.248

4×0.248

4×0.248

0

0

0.001

DPH, Gangtok

4×1.00

4×1.00

4×1.00

0

0

0.153

South

Rothak

2×0.10

2×0.10

2×0.10

0

0

0

West

Rimbi-I

3×0.20

3×0.20

3×0.20

0

0

0.165

Rimbi-II

2×0.50

2×0.50

2×0.50

0

0

0.415

Kalez

2×1.00

2×1.00

2×1.00

0

0

0.76

Total

41.892

41.892

41.892

48.03

38.528

40.84

Source: Sikkim Statistical Profile 2011-12

 

Hydro Electric Projects Alloted to Private and Public Sector as on March, 2011:

Sl. No

Name of the Project

Type

Agency

IC (MW)

Whether JV

1.

Teesta Stage-I

ROR

Himalayan Green Energy Pvt. ltd.

320

Yes

2.

Teesta Stage-II

ROR

Him Urja Infra Pvt. ltd.

330

Yes

3.

Teesta stage-III

ROR

Teesta Urja Pvt. Ltd.

1200

Yes

4.

Teesta Stage-IV

ROR

NHPC Ltd.

520

 

5.

Teesta Stage-V

ROR

NHPC Ltd.

510

 

6.

Teesta Stage-VI

ROR

Lanco Energy Pvt. Ltd.

500

Yes

7.

Lacher HEP

ROR

NHPC Ltd.

210

 

8.

Panam HEP

ROR

Himgiri Hydra Energy Pvt. Ltd.

300

Yes

9.

Lanchung HEP

ROR

Lanchung Power Pvt.ltd.

99

 

10.

Bhimkyong HEP

ROR

Teesta Power Pvt.Ltd.

99

 

11.

Bop HEP

ROR

Chungthang Power Pvt. Ltd

99

 

12.

Dikchu HEP

ROR

Sneha Kinetic Power Corporation

96

 

13.

Rongnichu HEP

ROR

Madhya Bharat Power Corporation

96

 

14.

Chujachen HEP

ROR

Gati Infrastructure Ltd.

99

Yes

15.

Bhasmey HEP

ROR

Gati Infrastructure Ltd.

51

Yes

16.

Sada Mangdar

ROR

Gati Infrastructure Ltd.

71

Yes

17.

Lethang HEP

ROR

KHC Lethang Hydro project pvt. Ltd

96

Yes

18.

Ting Ting HEP

ROR

T.T. Energy Pvt. Ltd.

99

 

19.

Tashiding HEP

ROR

Singa energy Pvt. Ltd.

97

 

20.

Kalez Khola-I HEP

ROR

Cosmic Infrapowergen Pvt. Ltd.

27.5

Yes

21.

Kalez Khola-II HEP

ROR

Pentacle Power Pvt. Ltd

54

Yes

22.

Rangit-IV HEP

ROR

Sikkim Hydro Ventures Ltd

66

 

23.

Rangit-III HEP

ROR

NHPC Ltd.

60

 

24.

Rangit-IV HEP

ROR

Jal Power Corporation Ltd

120

Yes

25.

Jorethang Loop HEP

ROR

DANs Energy Pvt. Ltd

96

 

26.

Recu HEPh

ROR

Green lake Power dev. Ltd

22

 

27.

Nathangchu HEP

ROR

Cosmic Infrapower Gen Pvt. Ltd

30

Yes

28.

Tsangu HEP

ROR

Cosmic Infrapowergen Pvt. Ltd.

30

Yes

29.

Rahikyong

ROR

Sikkim Engineering Pvt. Ltd.

25

Yes

Source: Sikkim Statistical Profile 2011-12

 

District wise Number of Consumer and Revenue Collection, 2010-11:

District

Number of consumer

Revenue Collection

(Rs. in lakhs)

Domestic

Commercial

Commercial

HTS

LTIS

BS

Total

East

34253

5154

139

128

124

5545

4327.78

West

13661

740

7

18

348

1113

131.22

North

6115

667

8

1

65

741

261.49

South

19453

2527

53

66

77

2723

654.31

Total

73482

9088

207

213

614

10122

5374.8

Source: Sikkim Statistical Profile 2011-12